A planned move from legacy hosting to the cloud, sequenced and rehearsed to avoid customer-facing downtime.

Fit
Usually the right call when one of these sounds familiar.
Hardware or contracts are reaching their end.
The risk of downtime keeps it on the list, not in progress.
Dependencies between applications are not written down.
You do not know what the move would cost or save.
Not the right service? A new environment from scratch: Cloud infrastructure. Releasing changes after the move: CI/CD pipelines.
Scope
The move is planned in writing and carried out in stages you have agreed. Each piece of work has a matching thing you receive.
A review of applications, data, integrations and the links between them.
A written inventory showing what exists, what depends on what and what can move first.
Workloads ordered by risk, with the lowest-risk moves first and a method chosen for each.
Stages, dates and responsibilities agreed with you before anything moves.
Practice runs of the move in a test environment, timed and reviewed.
Rehearsed steps and a written timetable for each move.
Data moved and checked at the destination, with a way back if a check fails.
A rollback plan written before each cutover and kept until the move is accepted.
Use cases
Practical situations where this service is put to work. Open a card to see how it applies.
An orderly move of applications and data to a cloud platform before hardware or contracts run out.
A staged migration where each application moves, is checked and is signed off before the next begins.
Data copied, kept in step with the live system and switched over in a short, rehearsed window.
Sample use cases, drafted as placeholders. The Plethora team confirms the final list.
Process
Four stops, agreed with you as we go. Each shows what we do and what we need from you.
We inventory your applications, data and dependencies, and note what makes each one hard or easy to move.
You share access to your systems and the people who know them.
We propose the order of moves, the method for each workload and the cutover windows.
You approve the plan and tell us when the business can accept a change.
We rehearse each move, then carry it out stage by stage, checking the result each time.
You test the migrated workloads and confirm each stage before we continue.
We hand over the new environment with documentation and retire the old one when you agree.
You decide when the old environment is switched off.
Quality
How the work is checked, accepted and passed to you.
Each cutover is practised in a test environment first.
Written before the move and kept until the stage is accepted.
Source and destination are compared, so you know nothing was lost.
Documentation, access and the retirement plan for the old environment.
Tools
Tools we use in delivery. We choose them to suit your team, and the list does not imply any partnership. Logos belong to their owners.
Engagement
A defined migration, planned, carried out and handed over.
Our engineers work with yours through the move, in your tools.
We keep tuning and supporting the new environment after the move.
Scope and cost are confirmed with you in writing before work starts.
FAQ
We plan every move to avoid customer-facing downtime, and rehearse it first. Where a short interruption is unavoidable, we agree the window with you in advance.
No. Some workloads are better left where they are, or moved later. The plan says which and why.
Often, yes. The inventory is where we find out what exists and what it depends on, before we commit to a plan.
It stays available until you accept the new one. Retiring it is a separate step that you approve.
Tell us what you run today and we will come back with next steps.